David
Typically from the boiler to the first valve is forged steel fittings or Sch 80 pipe. From there on Stanley’s I use 0.049 wall copper tubing, although where more support is needed I use pipe. The steam line to engine is all pipe. Water lines to the main boiler check and all fuel lines are tubing.
Rolly